Saturday, January 15, 2022

Santa Cruz Changes: 45 - Aptos library


The venerable Aptos library (shown at right) will soon be replaced, so Changes is jumping out to Aptos this week. According to this Good Times article:

"Plans are moving forward with the Aptos Branch Library project to raze the existing 8,000-square-foot building, near the corner of State Park and Soquel drives, and build a 12,400-square-foot replacement. . .the wrecking ball isn’t expected to swing loose until next summer."

As can be seen in the concept rendering at left, the overall size and shape of the new building won't be too different - a low one-story structure (haven't used the term "one-story" much lately!) We'll check on progress at some future date.

Grab the current issue of Good Times for more details, or go online to Aptos Friends of SCPL.

Santa Cruz Changes locations can be found on this Google Map.